Please use this identifier to cite or link to this item: https://repositorio.ufu.br/handle/123456789/33834
ORCID:  http://orcid.org/0000-0002-1832-3129
Document type: Trabalho de Conclusão de Curso
Access type: Acesso Aberto
Attribution-NonCommercial-NoDerivs 3.0 United States
Title: Planejamento e controle da manutenção e principais conceitos relacionados aos bancos de bateria no contexto de telecomunicações
Author: Silvério, Cláudio Correia
First Advisor: Tavares, Carlos Eduardo
First member of the Committee: Gomes, Luciano Coutinho
Second member of the Committee: Rezende, Paulo Henrique Oliveira
Summary: A área de manutenção já se provou fundamental nos mais diversos tipos de empresas, sejam elas com foco industrial ou em prestação de serviços. A partir desse ponto de vista, este trabalho tem como proposta mostrar os principais aspectos da implementação de um PCM com foco em bancos de bateria em ambientes de Telecomunicação. Para isso foram identificadas algumas peculiaridades do setor como descentralização das instalações físicas, dificuldade de acesso e mão de obra dedicada. Foram mostrados alguns dos principais pontos a se considerar com os equipamentos a serem instalados, cuidados nas instalações e parâmetros a serem acompanhados. O PCM com a ajuda do software PRISMA possibilitou identificar modelos e fabricantes que não cumpriam com as expectativas bem como estabelecer uma previsibilidade de falhas. Tudo isso permite que a empresa ou organização que utilize de um PCM tenha seus investimentos em infraestrutura aplicados de maneira mais assertiva, gerando crescimento financeiro e boa reputação para a mesma.
Abstract: The maintenance area has proven to be fundamental in the most diverse types of companies, whether they are industrially focused or in service provision. From this point of view, this work proposes to show the main aspects of the implementation of a MPC with a focus on battery banks in telecommunication environments. For this, some peculiarities of the sector were identified, such as decentralization of physical facilities, difficult access and dedicated labor work. Some of the main points to consider with the equipment to be installed, installation care and parameters to be monitored were shown. The MPC with the help of the PRISMA software made it possible to identify models and manufacturers that did not meet expectations as well as establish a predictability of failures. All of this allows the company or organization that uses a MPC to have its investments in infrastructure more assertively applied, generating financial growth and a good reputation for it.
Keywords: PCM
MPC
Bancos de Bateria
Battery Banks
Manutenção
Maintenance
Telecomunicação
Telecommunication
Area (s) of CNPq: CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA
Language: por
Country: Brasil
Publisher: Universidade Federal de Uberlândia
Quote: SILVÉRIO, Cláudio Correia. Planejamento e controle da manutenção e principais conceitos relacionados aos bancos de bateria no contexto de telecomunicações. 2021. 32 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Elétrica) - Universidade Federal de Uberlândia, Uberlândia, 2021.
URI: https://repositorio.ufu.br/handle/123456789/33834
Date of defense: 28-Oct-2021
Appears in Collections:TCC - Engenharia Elétrica

Files in This Item:
File Description SizeFormat 
PlanejamentoControleManutenção.pdfTrabalho de Conclusão de Curso1.52 MBAdobe PDFThumbnail
View/Open


This item is licensed under a Creative Commons License Creative Commons