Please use this identifier to cite or link to this item: https://repositorio.ufu.br/handle/123456789/43069
ORCID:  http://orcid.org/0009-0001-2288-3735
Document type: Trabalho de Conclusão de Curso
Access type: Acesso Aberto
Title: Aplicação de metodologias de gestão de risco na gestão em laboratório de pesquisa
Alternate title (s): Application of risk management methodologies in research laboratory management
Author: Agostini, Guilherme Salomão
First Advisor: Silva, Leonardo Rosa Ribeiro da
First member of the Committee: Arantes, Luciano José
Second member of the Committee: Souza, Felipe Chagas Rodrigues de
Summary: Após realizar entrevista com laboratório de pesquisa e desenvolvimento, foi constatado uma alta frequência em erros de estimativa de prazo e custo o que estava impactando no retorno sobre o capital investido (ROI) e na reputação do laboratório. Para que haja melhoria na projeção de estimativa, o primeiro passo é entender qual o escopo da atividade ali desenvolvida. Por se tratar de um laboratório de pesquisa e desenvolvimento a maior parte do escopo desenvolvido envolve inexistência de informações ou informações parciais sobre um tema desenvolvido. Sendo assim, é recomendado que o laboratório utilize-se da metodologia de gestão ágil, para que os riscos, indicadores e reavaliações sejam iterados o mais frequente possível possibilitando o pivotamento ou o tratamento dos riscos. Por fim, formas de agregar a gestão de risco à gestão de cronograma foram apresentadas: buscando complementar as estimativas de prazo e custo.
Abstract: After conducting an interview with a research and development laboratory, it was noted a high frequency of errors in time and cost estimation, which was impacting the return on investment (ROI) and the laboratory's reputation. In order to improve the estimation projection, the first step is to understand the scope of the activity being developed there. As it is a research and development laboratory, most of the developed scope involves lack of information or partial information about a developed topic. Therefore, it is recommended that the laboratory utilize agile management methodology so that risks, indicators, and reassessments are iterated as frequently as possible, enabling pivoting or risk treatment. Finally, ways to integrate risk management into schedule management were presented: seeking to complement time and cost estimates.
Keywords: Gestão de Risco
Gestão de cronograma
Estimativa de tempo
Risk Management
Schedule Management
Time Estimation
Area (s) of CNPq: CNPQ::ENGENHARIAS
Language: por
Country: Brasil
Publisher: Universidade Federal de Uberlândia
Quote: AGOSTINI, Guilherme Salomão. Aplicação de metodologias de gestão de risco na gestão em laboratório de pesquisa. 2024. 74 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Mecatrônica) – Universidade Federal de Uberlândia, Uberlândia, 2024.
URI: https://repositorio.ufu.br/handle/123456789/43069
Date of defense: 29-Apr-2024
Appears in Collections:TCC - Engenharia Mecatrônica

Files in This Item:
File Description SizeFormat 
AplicaçãoDeMetodologias.pdf4.23 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.