Title: Comissionamento classe 1 de usinas fotovoltaicas: procedimento e estudo de caso em Divinópolis-MG e Lagoa da Prata-MG
Alternate title (s): Class 1 commissioning of photovoltaic plants: procedure and case study in Divinópolis-MG and Lagoa da Prata-MG
Author: David, Wesley Santiago
First Advisor: Oliveira, Thales Lima
First member of the Committee: Macedo Junior, Jose Rubens
Second member of the Committee: Tavares, Carlos Eduardo
Summary: Geradores solares fotovoltaicos, também conhecidos como sistemas UFV, são um tipo de tecnologia que utiliza painéis solares para gerar energia elétrica renovável. O objetivo deste estudo é abordar os principais tópicos relacionados à fase de comissionamento de classe 1, conforme estabelecido pela ABNT NBR 16274:2014 - "Sistemas fotovoltaicos conectados à rede - Requisitos mínimos para documentação, ensaios de comissionamento, inspeção e avaliação de desempenho". Este trabalho apresentará as principais etapas pré-determinadas para a inspeção, testes e avaliação dos resultados encontrados no local, por meio de um estudo de caso de duas usinas solares fotovoltaicas de 6.540 kWp/5.000 kW, localizadas em Lagoa da Prata e Divinópolis, Minas Gerais, Brasil. Para realizar essa análise, equipamentos especializados foram utilizados para coletar dados e validar, mitigar e analisar possíveis falhas que possam ser encontradas na instalação.
Abstract: Photovoltaic solar generators, also known as UFV systems, are a type of technology that utilizes solar panels to generate renewable electrical energy. The purpose of this study is to address the main topics related to the class 1 commissioning phase, as established by ABNT NBR 16274:2014 - "Grid-connected photovoltaic systems - Minimum requirements for documentation, commissioning tests, inspection, and performance evaluation." This work will present the main pre-established stages for inspection, testing, and evaluation of on-site results, through a case study of two photovoltaic solar plants with capacities of 6,540 kWp/5,000 kW, located in Lagoa da Prata and Divinópolis, Minas Gerais, Brazil. Specialized equipment was used to collect data and validate, mitigate, and analyze any possible failures that may be found in the installation.
Keywords: Comissionamento
Gerador fotovoltaico
Usina Solar
Minigeração
Photovoltaic generator
Commissioning
Solar plant
Mini-generation
Area (s) of CNPq: CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA
Language: por
Country: Brasil
Publisher: Universidade Federal de Uberlândia
Quote: DAVID, Wesley Santiago. Comissionamento classe 1 de usinas fotovoltaicas: procedimento e estudo de caso em Divinópolis-MG e Lagoa da Prata-MG. 2023. 67 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Elétrica) – Universidade Federal de Uberlândia, Uberlândia, 2023
URI: https://repositorio.ufu.br/handle/123456789/38788
Date of defense: 17-May-2023
Appears in Collections:TCC - Engenharia Elétrica

Files in This Item:
File Description SizeFormat 
ComissionamentoClasse1Usinas.pdfTCC4.86 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.