Please use this identifier to cite or link to this item: https://repositorio.ufu.br/handle/123456789/28697
ORCID:  http://orcid.org/0000-0001-7768-7486
Document type: Tese
Access type: Acesso Aberto
Title: Um modelo de otimização multiobjetivo aplicado no dimensionamento da capacidade instalada de uma Pequena Central Hidrelétrica
Alternate title (s): A multiobjective optimization model applied for the sizing of the installed capacity of a Small Hydroelectric Power Plant
Author: Ferreira, Jacson Hudson Inácio
First Advisor: Camacho, José Roberto
First member of the Committee: Souza, Reinaldo Castro
Second member of the Committee: Guimarães Júnior, Sebastião Camargo
Third member of the Committee: Peretta, Igor Santos
Fourth member of the Committee: Silva, Sérgio Batista da
Summary: Para uma Pequena Central Hidrelétrica (PCH), o cuidadoso dimensionamento da capacidade instalada é uma das questões mais importantes para a elaboração do projeto básico, abrangendo análises que estimam o potencial hidrelétrico e planejam a operação da usina. Ou seja, o dimensionamento da capacidade especifica a rentabilidade do investimento e o desempenho energético da PCH. Atualmente, os sistemas hidrelétricos estão na fase de otimização da exploração a fim de maximizar a energia elétrica gerada com base na mesma quantidade de potência primária. Neste contexto, a presente tese tem por objetivo desenvolver um modelo de otimização multiobjetivo para o dimensionamento da capacidade instalada em PCHs, considerando a maximização do benefício líquido e a maximização da disponibilidade energética. Para esse propósito são aplicados os algoritmos de otimização multiobjetivo do NSGA II e o Evolução Diferencial Multiobjetivo (MODE) e os resultados obtidos para cada algoritmo são confrontados. Um estudo de caso foi desenvolvido na bacia hidrográfica do rio Tijuco, no município de Ituiutaba-MG, aplicando o modelo desenvolvido. Os resultados indicam que as funções objetivo são conflitantes, o algoritmo Evolução Diferencial apresenta resultados com uma convergência melhor para o estudo de caso e as características técnicas e econômicas da PCH obtiveram dimensões compatíveis com a finalidade do projeto.
Abstract: or a Small Hydroelectric Plant (SHP), the careful sizing of the installed capacity is one of the most important issues for the elaboration of the basic project, with analyses to estimate the hydroelectric potential and to plan the operation system of the plant. In other words, capacity sizing specifies the profitability of the investment and the energy performance of the SHP. Currently, hydroelectric systems are in the optimization phase of the exploration in order to increase the power generation based on the same amount of energy coming from the natural resource. In this context, the present thesis aims to develop a multiobjective optimization model for the sizing of installed capacity in SHPs, considering the maximization of net benefit and the maximization of energy availability. For this purpose, the NSGA II and Multiobjective Differential Evolution (MODE) are applied and the results obtained for each optimization algorithm are compared. A case study was developed in the Tijuco River hydrographic basin, in the municipality of Ituiutaba – MG, applying the developed model. The results indicate that the functions are conflicting, the Differential Evolution has the results with a better convergence for the case study and the technical and economic characteristics of the SHP obtained dimensions in accordance with the purpose of the project.
Keywords: Pequena Central Hidrelétrica
Capacidade instalada
Otimização multiobjetivo
Small Hydropower Plant
Installed capacity
Multiobjective optimization
Differential evolution
NSGA II
Area (s) of CNPq: CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA::GERACAO DA ENERGIA ELETRICA
Language: por
Country: Brasil
Publisher: Universidade Federal de Uberlândia
Program: Programa de Pós-graduação em Engenharia Elétrica
Quote: FERREIRA, Jacson Hudson Inácio. Um modelo de otimização multiobjetivo aplicado no dimensionamento da capacidade instalada de uma Pequena Central Hidrelétrica. 2020. 214 f. Tese (Doutorado em Engenharia Elétrica) - Universidade Federal de Uberlândia, Uberlândia, 2020. DOI http://doi.org/10.14393/ufu.te.2020.70
Document identifier: http://doi.org/10.14393/ufu.te.2020.70
URI: https://repositorio.ufu.br/handle/123456789/28697
Date of defense: 17-Jan-2020
Appears in Collections:TESE - Engenharia Elétrica

Files in This Item:
File Description SizeFormat 
ModeloOtimizacaoMultiobjetivo.pdf4.95 MBAdobe PDFThumbnail
View/Open


This item is licensed under a Creative Commons License Creative Commons