Please use this identifier to cite or link to this item:
https://repositorio.ufu.br/handle/123456789/39225
Document type: | Trabalho de Conclusão de Curso |
Access type: | Acesso Aberto |
Title: | Comissionamento de uma usina fotovoltaica de 2.026,08kWp/1.584 kW |
Alternate title (s): | Commissioning of a 2,026.08kWp/1,584 kW photovoltaic plant |
Author: | Teixeira, Walisson Martins |
First Advisor: | Gondim, Isaque Nogueira |
First member of the Committee: | Lima, Gustavo Brito de |
Second member of the Committee: | Gomes, Luciano Coutinho |
Summary: | Usinas fotovoltaicas, normalmente abreviadas por UFV’s, são sistemas de geração de energia elétrica renovável, utilizando-se painéis solares. Este trabalho tem como objetivo abordar os principais tópicos da fase de comissionamento conforme estabelecido pela ABNT NBR 16274:2014 – “Sistemas fotovoltaicos conectados à rede – Requisitos mínimos para documentação, ensaios de comissionamento, inspeção e avaliação de desempenho”. Será apresentado as principais etapas pré-estabelecidas de inspeção, testes e avaliações dos resultados encontrados in loco, através de um estudo de caso de uma usina fotovoltaica de 2.026,08 kWp/1.584 kW situada em Uberaba, Minas Gerais, Brasil. Desta maneira foi necessário o auxílio de equipamentos para as coletas de dados com objetivo de validar, mitigar e analisar quaisquer falhas que possam ser encontrados na instalação. |
Abstract: | Photovoltaic power plants, usually abbreviated as PVPs, are renewable energy electric generation systems that use solar panels. This work aims to address the main topics of the commissioning phase as established by ABNT NBR 16274:2014 - "Connected Photovoltaic Systems - Minimum Requirements for Documentation, Commissioning Tests, Inspection, and Performance Evaluation". The main pre-established stages of inspection, tests, and assessments of the results found in situ will be presented through a real case study of a 2,026.08 kWp/1,584 kW photovoltaic power plant located in Uberaba, Minas Gerais, Brazil. In this way, the assistance of equipment was necessary for data collection with the aim of validating, mitigating, and analyzing any flaws that may be found in the installation. |
Keywords: | Usina fotovoltaica Photovoltaic power plant Comissionamento Commissioning Usina solar Solar plant Minigeração fotovoltaica Small-scale photovoltaic generation |
Area (s) of CNPq: | CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA |
Language: | por |
Country: | Brasil |
Publisher: | Universidade Federal de Uberlândia |
Quote: | TEIXEIRA, Walisson Martins. Comissionamento de uma usina fotovoltaica de 2.026,08kWp/1.584 kW. 2023. 74 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Elétrica) – Universidade Federal de Uberlândia, Uberlândia, 2023. |
URI: | https://repositorio.ufu.br/handle/123456789/39225 |
Date of defense: | 6-Feb-2023 |
Appears in Collections: | TCC - Engenharia Elétrica |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Comissionamentousinafotovoltaica.pdf | TCC | 3.77 MB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License