Please use this identifier to cite or link to this item:
https://repositorio.ufu.br/handle/123456789/22341
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.creator | Paula, Luiz Eduardo Damião | - |
dc.date.accessioned | 2018-08-22T16:18:49Z | - |
dc.date.available | 2018-08-22T16:18:49Z | - |
dc.date.issued | 2018-07-05 | - |
dc.identifier.citation | PAULA, Luiz Eduardo Damião. Programa de manutenção do sistema elétrico de uma empresa atacadista. 2018. 137 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Elétrica) - Universidade Federal de Uberlândia, Uberlândia, 2018. | pt_BR |
dc.identifier.uri | https://repositorio.ufu.br/handle/123456789/22341 | - |
dc.description.abstract | The objective of this work is to describe a maintenance plan for the high-voltage (three-phase-AC) and low-voltage (three-phase AC) electrical system of a company based in the industrial district of Uberlandia. The high voltage system starts with a feeder of 13.8 KV derived from an aerial network of the concessionaire, substation of the same voltage and electrical lighting system and low voltage induction motors at 380 volts. The maintenance plan consists in a hall inspection of electrical maintenance and its descriptions as well as the description of the management system to ensure the quality and maximum operational availability of the equipment of the industry. These are instrumental predictive inspections and not instrumented and predictive according to a classification of equipment importance. Each inspection sheet is composed of the technical description of how it should be carried out, materials, tools and equipment to be used, periodicity, safety description to be applied during inspection and field for other observations. In addition, there is a description of a management system for quality assurance and work safety using competent engineering. The management system involves the basic pillars of maintenance of a competent maintenance with appropriation and analysis of maintenance indices as factor of availability, stop index, costs, and others. | pt_BR |
dc.language | por | pt_BR |
dc.publisher | Universidade Federal de Uberlândia | pt_BR |
dc.rights | Acesso Aberto | pt_BR |
dc.subject | Manutenção | pt_BR |
dc.subject | Programa | pt_BR |
dc.subject | Atacadista | pt_BR |
dc.subject | Preventiva | pt_BR |
dc.subject | Preditiva | pt_BR |
dc.subject | Corretiva | pt_BR |
dc.subject | Inspeção | pt_BR |
dc.subject | Sistema Elétrico | pt_BR |
dc.subject | Equipamento | pt_BR |
dc.subject | Plano de Manutenção | pt_BR |
dc.subject | Qualidade | pt_BR |
dc.subject | Diagrama Unifilar | pt_BR |
dc.subject | Maintenance Plan | pt_BR |
dc.subject | Electrical System | pt_BR |
dc.subject | Predictive | pt_BR |
dc.subject | Equipment | pt_BR |
dc.subject | Periodicity | pt_BR |
dc.subject | Quality | pt_BR |
dc.subject | Availability | pt_BR |
dc.subject | Maintenance | pt_BR |
dc.subject | Maintenance indices | pt_BR |
dc.subject | Indicadores | pt_BR |
dc.subject | Periodicidade | pt_BR |
dc.subject | 13.8 kV | pt_BR |
dc.subject | High-voltage | pt_BR |
dc.subject | Low-voltage | pt_BR |
dc.subject | Alta tensão | pt_BR |
dc.subject | Baixa tensão | pt_BR |
dc.subject | Uberlândia | pt_BR |
dc.subject | Electrical | pt_BR |
dc.subject | Preventive | pt_BR |
dc.subject | Costs | pt_BR |
dc.title | Programa de manutenção do sistema elétrico de uma empresa atacadista | pt_BR |
dc.title.alternative | Maintenance plan of a wholesale company electrical system | pt_BR |
dc.type | Trabalho de Conclusão de Curso | pt_BR |
dc.contributor.advisor1 | Morais, Josué Silva de | - |
dc.contributor.advisor1Lattes | http://lattes.cnpq.br/2007658962904545 | pt_BR |
dc.contributor.referee1 | Moraes, Adélio José | - |
dc.contributor.referee1Lattes | http://lattes.cnpq.br/2836183311239381 | pt_BR |
dc.contributor.referee2 | Tavares, Carlos Eduardo | - |
dc.contributor.referee2Lattes | http://lattes.cnpq.br/1493379294936870 | pt_BR |
dc.creator.Lattes | http://lattes.cnpq.br/1380380176537686 | pt_BR |
dc.description.degreename | Trabalho de Conclusão de Curso (Graduação) | pt_BR |
dc.description.resumo | Este trabalho tem como meta descrever um plano de manutenção para o sistema elétrico de alta tensão (trifásico- AC) e baixa tensão (trifásico AC) de uma empresa sediada no distrito industrial de Uberlândia. O sistema de alta tensão inicia por um alimentador de 13,8 KV derivando de uma rede aérea da concessionária, subestação de mesma tensão e sistema elétrico de iluminação e motores de baixa tensão em 380 volts. O plano de manutenção está composto por um hall de inspeções de manutenções elétricas e suas descrições bem como a descrição do sistema de gestão para garantir a qualidade e disponibilidade operacional máxima dos equipamentos da indústria. Trata-se de inspeções preditivas instrumentadas e não instrumentadas e preditivas segundo uma classificação de importância dos equipamentos. Cada folha de inspeção é composta pela descrição técnica de como ela deve ser realizada, materiais, ferramentas e equipamento que devem serem utilizados, periodicidade, descrição da segurança a ser aplicada durante a inspeção e campo para outras observações. Além disso, há uma descrição de um sistema de gestão para garantia da qualidade e segurança do trabalho usando uma engenharia competente. O sistema de gestão envolve os pilares base de sustentação de uma manutenção competente com apropriação e análise de índices de manutenção como fator de disponibilidade, índice de parada, custos e outros. | pt_BR |
dc.publisher.country | Brasil | pt_BR |
dc.publisher.course | Engenharia Elétrica | pt_BR |
dc.sizeorduration | 137 | pt_BR |
dc.subject.cnpq | CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA | pt_BR |
Appears in Collections: | TCC - Engenharia Elétrica |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
ProgramaManutencaoSistema.pdf | TCC | 2.52 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.