Please use this identifier to cite or link to this item: https://repositorio.ufu.br/handle/123456789/14586
Document type: Dissertação
Access type: Acesso Aberto
Title: Uma contribuição ao estudo da estimativa do potencial hidrelétrico de pequenas centrais hidráulicas
Alternate title (s): A contribution to the study of the estimate hydroelectric potential for small hydropower plant
Author: Ferreira, Jacson Hudson Inácio
First Advisor: Camacho, José Roberto
First member of the Committee: Guimarães Júnior, Sebastião Camargo
Second member of the Committee: Matos, Fernando Barbosa
Summary: Esta dissertação tem como objetivo estudar e desenvolver uma metodologia para a primeira etapa do ciclo de implantação de uma Pequenas Centrais Hidráulica (PCH), a Estimativa do Potencial Hidrelétrico, etapa em que se estudam as situações favoráveis e desfavoráveis à implantação de pequenas usinas. Basea-se em critérios socioambientais, técnicos e econômicos de uma bacia hidrográfica, conforme dados secundários que são disponibilizados pelas agências e instituições responsáveis por cada critério. Os dados da coleta para o estudo observam os aspectos geológicos geotécnicos, socioambientais, infraestrutura e logística, disponibilidade hídrica e topografia. Além disso, apresenta o uso da ferramenta de Sistema de Informação Geográfica SIG, sistema com capacidade para aquisição, manipulação e exibição de informações digitais georreferenciadas, capaz de gerar mapas onde os aspectos relevantes são apresentados e analisados, e utiliza a Hidrologia Estatística para o estudo hidrológico, onde se verifica a vazão de um rio ou a precipitação em um local ou região. Ao final, apresenta a estimativa da energia média gerada, ou potência média, baseando-se primeiro na variação dos valores de vazão ao longo de um ano médio, e queda constante, depois com valores constantes de vazão e queda, estimando a potência específica do local, o tipo de turbina hidráulica, potência e tensão do gerador elétrico. Foi aplicado um estudo de caso da metodologia em questão na bacia hidrográfica do rio Tijuco, limitado ao município de Ituiutaba MG.
Abstract: The aim of this masterthesis is to study and develop a methodology for the first stage of the deployment of a Small Hydraulic Plant (SHP), the Estimate Hydroelectric Potential, stage in which is studied the favorable and unfavorable situations to the deployment of small plants. Basing on environmental, technical and economic criteria of a watershed, according secondary data that are provided by agencies and institutions responsible for each criterion. Data collections for the study observe the geological and geotechnical, environmental, infrastructure and logistics, water availability and topography aspects. Moreover, it presents the use of GIS (Geographic Information Systems) to generate maps where relevant aspects are presented and analyzed, and it use the Hydrology Statistics for the hydrological study, to verify the flow of a river or precipitation at a local or region. At the end, it presents the estimate average energy generated, or average power, basing first on the variation of flow over an average year, and constant height, then with constant values of flow and height, estimating the specific power location, the type of water turbine, power and voltage of electric generator. It was applied a study case of the methodology in the watershed of the Tijuco river, limited to the city of Ituiutaba MG.
Keywords: Pequenas centrais hidráulicas
Estimativa do potencial hidrelétrico
Hidrologia estatística
Rio Tijuco
Small hydraulic plants
Estimate hydroelectric potential
Geographic information systems
Hydrology statistics
Tijuco river
Usinas hidrelétricas
Sistemas de Informação Geográfica
Hidrologia
Area (s) of CNPq: CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA
Language: por
Country: BR
Publisher: Universidade Federal de Uberlândia
Institution Acronym: UFU
Department: Engenharias
Program: Programa de Pós-graduação em Engenharia Elétrica
Quote: FERREIRA, Jacson Hudson Inácio. A contribution to the study of the estimate hydroelectric potential for small hydropower plant. 2014. 108 f. Dissertação (Mestrado em Engenharias) - Universidade Federal de Uberlândia, Uberlândia, 2014. DOI https://doi.org/10.14393/ufu.di.2014.505
Document identifier: https://doi.org/10.14393/ufu.di.2014.505
URI: https://repositorio.ufu.br/handle/123456789/14586
Date of defense: 24-Oct-2014
Appears in Collections:DISSERTAÇÃO - Engenharia Elétrica

Files in This Item:
File Description SizeFormat 
ContribuicaoEstudoEstimativa.pdf2.41 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.